Items where Subject is "QE Geology"

Group by: Creators/Penulis | Item Type
Jump to: Thesis
Number of items at this level: 179.

Thesis

Abdillah, Rifqi (2017) EVALUASI DESAIN PRODUCTION CASING 13-3/8” PADA SUMUR EKSPLORASI LAUT DALAM LAPANGAN XX. S1 thesis, Institut Teknologi Sains Bandung.

Abiyoso, Haryo (2018) OPTIMASI HIDROLIKA PADA TRAYEK 12 1⁄4” DENGAN MENGGUNAKAN METODE BIT HYDRAULIC IMPACT (BHI) DI SUMUR X-1. S1 thesis, Institut Teknologi Sains Bandung.

Abrijani, Aldie Wahab (2019) EVALUASI DAN RE-OPTIMASI SUCKER ROD PUMP PADA SUMUR L5A-XY LAPANGAN FINS BERDASARKAN EFISIENSI VOLUMETRIK POMPA. S1 thesis, Institut Teknologi Sains Bandung.

Adiananta, Ragil Tri (2019) EVALUASI KEEKONOMIAN LAPANGAN MIGAS “RAG” MENGGUNAKAN MODEL KONTRAK BAGI HASIL PRODUCTION SHARING CONTRACT-COST RECOVERY DAN PRODUCTION SHARING CONTRACT-GROSS SPLIT PASCA BERAKHIRNYA KONTRAK DENGAN PEMERINTAH. S1 thesis, Institut Teknologi Sains Bandung.

Adithya, Ario Permadi (2019) STUDI PERBANDINGAN PENANGANAN EMULSI MINYAK – AIR DI SLOPTANK DENGAN MENGGUNAKAN METODE PEMISAHAN KIMIAWI DAN HEATER TREATER. S1 thesis, Institut Teknologi Sains Bandung.

Affian, Aghisna Prima (2020) PENGARUH KEGIATAN PERFORASI PADA PENURUNAN TEKANAN DI SUMUR GAS. S1 thesis, Institut Teknologi Sains Bandung.

Afrisca, Cindy Clara (2017) EVALUASI RIGLESS WELL ABANDONMENT PADA LAPANGAN Y. S1 thesis, Institut Teknologi Sains Bandung.

Alesandro, Finkie William (2018) ANALISA DESAIN SLURRY SEMEN DENGAN ADITIF GULA PASIR SEBAGAI FUNGSI RETARDER PADA SEMEN PEMBORAN KELAS G DENGAN METODE API 10A. S1 thesis, Institut Teknologi Sains Bandung.

Alvando, Carolus Vito (2019) EVALUASI KINERJA PAHAT PADA TRAYEK 17 1⁄2” DAN 12 1⁄4” SUMUR X LAPANGAN Y. S1 thesis, Institut Teknologi Sains Bandung.

Amanda, Augita (2019) ANALISIS KEEKONOMIAN PADA PENGEMBANGAN LAPANGAN Y MENGGUNAKAN HASIL PERKIRAAN PRODUKSI SIMULASI RESERVOIR. S1 thesis, Institut Teknologi Sains Bandung.

Anangda, Muhammad Eru (2019) EVALUASI STIMULASI SUMUR X LAPANGAN Y DENGAN METODE MATRIX ACIDIZING. S1 thesis, Institut Teknologi Sains Bandung.

Andadary, Hayatun Nisa (2018) PERHITUNGAN TEKANAN PORI UNTUK MENENTUKAN TEKANAN ABNORMAL SEBUAH STUDI KASUS PADA LAPANGAN XYZ. S1 thesis, Institut Teknologi Sains Bandung.

Aprilia, Vicky (2021) KAJIAN EKONOMIS TERHADAP PERUBAHAN PSC COST RECOVERY MENJADI GROSS SPLIT UNTUK WILAYAH KERJA CMB “X” di SUMATERA SELATAN. S1 thesis, Institut Teknologi Sains Bandung.

Ardi, Shilmi (2019) OPTIMASI LAJU PEMBORAN (ROP) PADA OPERASI PEMBORAN SUMUR S LAPANGAN CIKARANG MENGGUNAKAN METODE ARTIFICIAL NEURAL NETWORK. S1 thesis, Institut Teknologi Sains Bandung.

Aryandini, Gievany Laras (2019) EVALUASI KEEKONOMIAN DALAM PEMILIHAN UKURAN TUBING PADA PRODUKSI SUMUR GV. S1 thesis, Institut Teknologi Sains Bandung.

Aslini, Islamita (2021) EVALUASI DAN RE-OPTIMASI SUCKER ROD PUMP PADA SUMUR X, Y, DAN Z LAPANGAN M BERDASARKAN EFISIENSI VOLUMETRIK POMPA. S1 thesis, Institut Teknologi Sains Bandung.

Asyrofi, Farhan Farid (2022) PERBANDINGAN EFISIENSI OPERASIONAL PEMBORAN ANTARA PILOT HOLE DAN GEOSTEERING PADA SUMUR HORIZONTAL Z-09 LAPANGAN DEEPWATER FH. S1 thesis, Institut Teknologi Sains Bandung.

Awab, Malik (2019) STUDI INTEGRASI WELL TESTING ANALYSIS DAN RESERVOIR CHARACTERIZATION UNTUK DISTRIBUSI PROPERTI RESERVOIR. S1 thesis, Institut Teknologi Sains Bandung.

Azkaa, Mulia (2018) OPTIMASI DESAIN INTERMEDIATE CASING PADA LAPANGAN X. S1 thesis, Institut Teknologi Sains Bandung.

Azzahra, Fatimah (2023) PERENCANAAN SQUEEZE CEMENTING PADA SUMUR AZR-26 LAPISAN TAF-3.1. S1 thesis, Institut Teknologi Sains Bandung.

Bagaskara, Titan (2022) ANALISA PRESSURE LOSS DI BHA PADA PENGEBORAN SUMUR X MENGGUNAKAN SOFTWARE LANDMARK. S1 thesis, Institut Teknologi Sains Bandung.

Bahari, Fajrina Rizki (2022) REDESIGN POMPA ELECTRIC SUBMERSIBLE PUMP (ESP) DI SUMUR “AR-1, AR-2, AR-3” STRUKTUR “F dan L” FIELD “SKZ” PT PERTAMINA HULU ROKAN ZONA 1. S1 thesis, Institut Teknologi Sains Bandung.

Banendro, Yohanes Berchmans Bayuaji (2020) STUDI LABORATORIUM PENGARUH KONSENTRASI HYDROPHOBIC SILICA NANOPARTICLES DAN SALINITAS AIR FORMASI TERHADAP STABILITAS SISTEM FOAM/EMULSI FLUIDA PENDESAK UNTUK PROSES PENINGKATAN FAKTOR PEROLEHAN MINYAK (EOR). S1 thesis, Institut Teknologi Sains Bandung.

Basri, Andi Nur Ilmi (2022) EVALUASI CASING DESIGN SUMUR PEMBORAN DENGAN METODE MAXIMUM LOAD PADA SUMUR X DI LAPANGAN Y. S1 thesis, Institut Teknologi Sains Bandung.

Budiman, Mohamad Irgi (2020) EVALUASI SUMUR UNTUK MENINGKATKAN LAJU PRODUKSI PADA PERMASALAHAN SCALE DI SUMUR X LAPANGAN Y. S1 thesis, Institut Teknologi Sains Bandung.

Caldas, Laurensius Apri Prasetyo (2021) ANALISA KEDALAMAN TERBENTUKNYA WAX PADA SUMUR "X" LAPANGAN "Y". S1 thesis, Institut Teknologi Sains Bandung.

Christalia, Maria Yosephine (2019) PERENCANAAN DESAIN ELECTRICAL SUBMERSIBLE PUMP SUMUR M-15 (EKSPLORASI) LAPANGAN P. S1 thesis, Institut Teknologi Sains Bandung.

Clarisa, Vesty Merinda (2019) STUDI SIMULASI PEMILIHAN POLA INJEKSI AIR UNTUK MENINGKATKAN PEROLEHAN MINYAK PADA LAPANGAN P. S1 thesis, Institut Teknologi Sains Bandung.

Cristine, Megawati Agus (2022) KONVERSI ARTIFICIAL LIFT DARI GAS LIFT MENJADI ESP PADA SUMUR M-01 DAN M-02 LAPANGAN MS PT MEDCO E&P INDONESIA. S1 thesis, Institut Teknologi Sains Bandung.

Daniel, Fajar (2018) PEMILIHAN METODE ARTIFICIAL LIFT YANG TEPAT PADA LAPANGAN MIGAS. S1 thesis, Institut Teknologi Sains Bandung.

Dermawan, Adi Putra (2022) EVALUASI CASING SETTING DEPTH PADA SUMUR X DENGAN MEMPERHITUNGKAN KICK TOLERANCE. S1 thesis, Institut Teknologi Sains Bandung.

Dermawan, Cahya Wahyu (2021) KAJIAN KEEKONOMIAN DALAM PENENTUAN ALOKASI INVESTASI PADA PENGEMBANGAN LAPANGAN- LAPANGAN MINYAK DI WILAYAH KERJA Z. S1 thesis, Institut Teknologi Sains Bandung.

Destrianty, Amanda Efa (2019) OPTIMASI LAJU PRODUKSI PROGRESSIVE CAVITY PUMP PADA SUMUR X LAPANGAN Y. S1 thesis, Institut Teknologi Sains Bandung.

Dewantoro, Reka Satria (2019) OPTIMASI ALOKASI INJEKSI GAS PADA SUMUR GAS LIFT LAPANGAN X. S1 thesis, Institut Teknologi Sains Bandung.

Dwipayana, Rahardian (2019) OPTIMASI PRODUKSI PADA PENGEMBANGAN LAPANGAN X BERDASARKAN HASIL PERKIRAAN PRODUKSI SIMULASI RESERVOIR DAN EVALUASI KEEKONOMIAN. S1 thesis, Institut Teknologi Sains Bandung.

Dwisufharno, Raden Mas Fauzan Al'Basit (2019) EVALUASI KEEKONOMIAN WILAYAH KERJA MINYAK. S1 thesis, Institut Teknologi Sains Bandung.

Dwisuryo, Guno Aji (2023) EVALUASI KEEKONOMIAN MODEL KONTRAK PRODUCTIOIN SHARING CONTRACT COST RECOVERY DAN GROSS SPLIT PADA LAPANGAN X. S1 thesis, Institut Teknologi Sains Bandung.

Dzulfiqar, Fakhri (2020) EVALUASI PERENCANAAN DESAIN CASING PADA SUMUR X DI LAPANGAN Y MENGGUNAKAN DRILLING SOFTWARE. S1 thesis, Institut Teknologi Sains Bandung.

Ekawati, Kania Dewi (2019) STUDI LABORATORIUM PENINGKATAN PEROLEHAN MINYAK TAHAP LANJUT “ENHANCED OIL RECOVERY” DENGAN METODE INJEKSI SURFAKTAN POLIMER PADA LAPANGAN BGR. S1 thesis, Institut Teknologi Sains Bandung.

Elawati, Elawati (2023) ANALISA DESAIN KOMPLESI LAUT DALAM PADA SUMUR “X” LAPANGAN “EL” KALIMANTAN TIMUR. S1 thesis, Institut Teknologi Sains Bandung.

Faaiziin, Bima Rizal (2020) ANALISA HIDROLIKA PEMBORAN MENGGUNAKAN APLIKASI PADA SUMUR HOKYA LAPANGAN AMBYAR. S1 thesis, Institut Teknologi Sains Bandung.

Fadillah, Reza (2023) ANALISA PERBANDINGAN SHEAR STRESS RHEOLOGY LUMPUR PEMBORAN MENGGUNAKAN APLIKASI PADA SECTION ASELOLE LAPANGAN JOSS. S1 thesis, Institut Teknologi Sains Bandung.

Fahliby, Fonkqy Arista (2018) EVALUASI TOLL FEE PIPA TRANSMISI GAS X-Y DAN Y-Z DENGAN MODEL BLASSIUS, WEYMOUTH, PANDHANDLE A DAN PANDHANDLE B. S1 thesis, Institut Teknologi Sains Bandung.

Fala, Lulut Fitra (2018) METODOLOGI OPTIMASI PENENTUAN LOKASI DAN JUMLAH SUMUR PENGEMBANGAN PADA RESERVOIR LEVEED CHANNEL MULTILAYER. S1 thesis, Institut Teknologi Sains Bandung.

Faturakman, Raka (2022) EVALUASI DAN ANALISA PERMASALAHAN ELECTRICAL SUBMERSIBLE PUMP UNTUK MENINGKATKAN LAJU PRODUKSI PADA SUMUR “X” LAPANGAN “Y”. S1 thesis, Institut Teknologi Sains Bandung.

Fikaryazi, Fikaryazi (2021) PERBANDINGAN EFFISIENSI DESAIN ESP OCEC VS REDA PADA SUMUR “X” LAPANGAN “Y”. S1 thesis, Institut Teknologi Sains Bandung.

Firmansyah, Farhan Rifqi (2021) EVALUASI KETEKNIKAN DAN KEEKONOMIAN PADA RENCANA PENGEMBANGAN LAPANGAN-X BERDASARKAN PEDOMAN TATA KERJA POD SKKMIGAS. S1 thesis, Institut Teknologi Sains Bandung.

Gaol, Rimanarita Lumban (2019) STUDI SIMULASI PENERAPAN INJEKSI CO2 SECARA HUFF & PUFF PADA SUMUR DNY LAPANGAN X. S1 thesis, Institut Teknologi Sains Bandung.

Giovanni, Della (2015) STUDI KEEKONOMIAN PADA PENGEMBANGAN RESERVOIR CBM (COALBED METHANE) BLOK Z. S1 thesis, Institut Teknologi Sains Bandung.

Handayani, Satria (2015) PREDIKSI PERMEABILITAS DAN ROCK TYPING PADA ZONA LOW-RESISTIVITY. S1 thesis, Institut Teknologi Sains Bandung.

Hanindio, Kadya (2019) EVALUASI KEEKONOMIAN DALAM PENENTUAN RENCANA PENGEMBANGAN LAPANGAN MIGAS DI WILAYAH KERJA X. S1 thesis, Institut Teknologi Sains Bandung.

Harahap, Debbya Debora Sari (2018) KAJIAN KEEKONOMIAN PENERAPAN TEKNOLOGI ENHANCED OIL RECOVERY (EOR) UNTUK PENINGKATAN PEROLEHAN MINYAK BUMI DI STRUKTUR X. S1 thesis, Institut Teknologi Sains Bandung.

Hardiansyah, Hardiansyah (2017) OPTIMASI DESAIN PEREKAHAN HIDRAULIK DENGAN MODEL GEOMEKANIK. S1 thesis, Institut Teknologi Sains Bandung.

Harjuman, Alnof (2020) EVALUASI ELECTRIC DOWNHOLE HEATER PADA SUMUR X LAPANGAN Y. S1 thesis, Institut Teknologi Sains Bandung.

Haryutomo, Ganang (2021) ANALISA RESPON INJEKSI AIR TERHADAP KENAIKAN FLUID LEVEL PADA LAPANGAN Y DENGAN METODE SONOLOG. S1 thesis, Institut Teknologi Sains Bandung.

Hazhia, Gabrella Valentina (2019) EVALUASI FINDING COST EKSPLORASI MIGAS DI WILAYAH INDONESIA. S1 thesis, Institut Teknologi Sains Bandung.

Hermawan, Wawan (2018) ANALISIS WELLHEAD GROWTH (PERTUMBUHAN WELLHEAD) AKIBAT CASING THERMAL STRESS, SEBUAH STUDI LAPANGAN. S1 thesis, Institut Teknologi Sains Bandung.

Hidayat, Abiyan Taufiq (2021) EVALUASI STIMULASI SUMUR A DENGAN METODE MATRIX ACIDIZING PADA LAPANGAN B. S1 thesis, Institut Teknologi Sains Bandung.

Hidayat, Rizki (2019) STRATEGI MEMAKSIMALKAN FAKTOR PEROLEHAN PADA RESERVOIR MULTILAYER. S1 thesis, Institut Teknologi Sains Bandung.

Hidayat, Vicky Fahri (2018) EVALUASI PEMILIHAN RIG UNTUK PEMBORAN SUMUR PENGEMBANGAN DI LAPANGAN XYZ. S1 thesis, Institut Teknologi Sains Bandung.

Hilaby, Yaqub Sulaeman (2018) EVALUASI DAN DESAIN ULANG KINERJA ELECTRICAL SUBMERSIBLE PUMP PADA SUMUR S. S1 thesis, Institut Teknologi Sains Bandung.

Horipil, Ipander (2022) ANALISIS LINTASAN PEMBORAN BERARAH DENGAN METODE PERHITUNGAN HASIL SURVEY PADA SUMUR Y DILAPANGAN PETROLEA-18. S1 thesis, Institut Teknologi Sains Bandung.

Hutomo, Kresno Bri (2018) KONVERSI LIFTING ELECTRIC SUBMERSIBLE PUMP KE GAS LIFT DAN PENGINJEKSIAN POUR POINT DEPRESSANT. S1 thesis, Institut Teknologi Sains Bandung.

Ibrahim, Reza (2019) DESAIN LUMPUR UNTUK MENGATASI CLAY REAKTIF PADA FORMASI MENGGUNAKAN ADITIF KCL DAN SOLTEX. S1 thesis, Institut Teknologi Sains Bandung.

Idrus, Aditya Ilham (2019) PERANCANGAN CONTINUOUS GAS LIFT PADA SUMUR X. S1 thesis, Institut Teknologi Sains Bandung.

Insan, Azhar (2018) EVALUASI KINERJA SUMUR X DENGAN PERENCANAAN ARTIFICIAL LIFT PADA LAPANGAN A-8. S1 thesis, Institut Teknologi Sains Bandung.

Irwanda, Irwan (2019) DESAIN PLUG AND ABANDONMENT (P&A) PADA LAPANGAN R DENGAN STANDAR OPERASI SNI 13-6910-2002. S1 thesis, Institut Teknologi Sains Bandung.

Islami, Mochammad Irkham (2015) EVALUASI HARGA KEEKONOMIAN GAS BERDASARKAN PERUBAHAN KESEPAKATAN PEMBANGUNAN CPP ANTARA PRODUSEN DAN PEMBELI GAS. S1 thesis, Institut Teknologi Sains Bandung.

Ismaya, Eri Dian (2018) PERBANDINGAN INJEKSI HIGH SALINITY DAN LOW SALINITY EOR PADA LOKASI YANG BERBEDA : SUATU STUDI SIMULASI. S1 thesis, Institut Teknologi Sains Bandung.

Jay, Auliya Rahman (2021) PREDIKSI TEKANAN PORI PADA SUMUR ”MON“ LAPANGAN “TRIX“ MENGGUNAKAN METODA EATON. S1 thesis, Institut Teknologi Sains Bandung.

Jaya, M Yusuf Indra (2022) EVALUASI CASING DESIGN DENGAN METODA MAXIMUM LOAD PADA SUMUR OLIS LAPANGAN ONSHORE. S1 thesis, Institut Teknologi Sains Bandung.

Kapa, Grey Gori Rismanto (2018) STUDI LABORATORIUM PENGARUH INJEKSI SURFAKTAN POLIMER UNTUK APLIKASI EOR PADA LAPANGAN XYZ. S1 thesis, Institut Teknologi Sains Bandung.

Khabibilah, Rizkon (2022) OPTIMASI DESIGN LIGHT WEIGHT CEMENT UNTUK MENGATASI MASALAH PENYEMENAN DI WEAK FORMATION. S1 thesis, Institut Teknologi Sains Bandung.

Khohar, Ahmad (2019) UJI SENSITIVITAS DAN ANALISIS SISTEM NODAL UNTUK MENENTUKAN UKURAN TUBING PADA SUMUR X. S1 thesis, Institut Teknologi Sains Bandung.

Kristiawan, Catur (2020) PENGEMBANGAN METODE PENENTUAN EKSPONEN SATURASI. S1 thesis, Institut Teknologi Sains Bandung.

Kurnianto, Mahyar (2019) ANALISA POLA ALIR DAN PREDIKSI KEDALAMAN TERBENTUKNYA WAX PADA SUMUR X LAPANGAN Y. S1 thesis, Institut Teknologi Sains Bandung.

Kurniawan, Hendrik Riski (2018) EVALUASI KEEKONOMIAN LAPANGAN MIGAS NON KONVENSIONAL X MENGGUNAKAN MODEL KONTRAK PRODUCTION SHARING CONTRACT (PSC) DAN GROSS SPLIT. S1 thesis, Institut Teknologi Sains Bandung.

Kurniawan, Rian (2018) EVALUASI DAN DESAIN ULANG SUCKER ROD PUMP PADA SUMUR P-72 LAPANGAN SUKAMAHI. S1 thesis, Institut Teknologi Sains Bandung.

Kurniawan, Rolandi (2019) ANALISA KINERJA WAG PADA RESERVOIR MINYAK HETEROGEN DENGAN POLA INJEKSI 5 TITIK DAN HUBUNGANNYA DENGAN ARPS DECLINE CURVE EXPONENT. S1 thesis, Institut Teknologi Sains Bandung.

Kusumawardhana, Wakhid (2019) DESIGN PERALATAN SURFACE FACILITIES: SEPARTING AND TREATING PRODUCED GAS LAPANGAN X. S1 thesis, Institut Teknologi Sains Bandung.

Kusyanto, Yayan (2018) SUATU STUDI SIMULASI RESERVOIR DALAM UPAYA MEMPERKIRAKAN KINERJA RESERVOIR LAPANGAN X. S1 thesis, Institut Teknologi Sains Bandung.

Laila, Raudatul (2019) SURFACTANT SLUG ENHANCED WATERFLOODING PADA ZONA C CLUSTER SUMUR BX DAN BY LAPANGAN B: SUATU STUDI SIMULASI. S1 thesis, Institut Teknologi Sains Bandung.

Lasmono, Mochammad Shindu Arya (2019) RENCANA PENGEMBANGAN LAPANGAN HARTINI. S1 thesis, Institut Teknologi Sains Bandung.

Lizaksono, Oni Bagus (2018) OPTIMASI PEMILIHAN FIXED CUTTER BIT PADA LAPANGAN X DENGAN MEMPERTIMBANGKAN COST PER FEET DAN METODE KEKERASAN BATUAN. S1 thesis, Institut Teknologi Sains Bandung.

Lutfiana, Mifta (2019) EVALUASI KEEKONOMIAN WILAYAH KERJA MIGAS KONVENSIONAL“DNN” PASCA BERAKHIRNYA KONTRAK DENGAN PEMERINTAH MENGGUNAKAN MODEL KONTRAK PSC DAN GROSS SPLIT. S1 thesis, Institut Teknologi Sains Bandung.

Mandiri, Pandyo Cika Putra (2023) EVALUASI CASING DESIGN DENGAN METODE MAXIMUM LOAD PADA SUMUR “PCPM-29“ LAPANGAN “PM“. S1 thesis, Institut Teknologi Sains Bandung.

Mangesu, Ones Alfrianto (2019) EVALUASI DAN PERANCANGAN ULANG OPERASI ESP PADA SUMUR ZB-01, LAPANGAN LEPAS PANTAI Y. S1 thesis, Institut Teknologi Sains Bandung.

Manggrat, Januarika Veronika Finyabin (2021) EVALUASI DAN PERENCANAAN ULANG ELECTRICAL SUBMERSIBLE PUMP PADA SUMUR KY LAPANGAN TANJUNG. S1 thesis, Institut Teknologi Sains Bandung.

Manurung, Herwin (2022) KAJIAN KEEKONOMIAN PADA USULAN PERUBAHAN KONTRAK WILAYAH KERJA MIGAS NON-KONVENSIONAL UNTUK MENDUKUNG PRODUKSI 12 BSCFD GAS DAN MINYAK 1 JUTA BOPD PADA TAHUN 2030. S1 thesis, Institut Teknologi Sains Bandung.

Marfianto, Beno (2018) STUDI LABORATORIUM ANALISA DESAIN SLURRY SEMEN DENGAN ADITIF CANGKANG TELUR PADA METODE API SPEC.10A. S1 thesis, Institut Teknologi Sains Bandung.

Martadireja, Okky Pratama (2015) KAJIAN KEEKONOMIAN PADA PENGEMBANGAN SHALE HYDROCARBON BLOK A DI INDONESIA. S1 thesis, Institut Teknologi Sains Bandung.

Muhammad, Iqro (2018) DESAIN UKURAN GRAVEL PACK PADA SUMUR LEVARG-18 DAN LEVARG-19 SEBAGAI APLIKASI DARI MASALAH KEPASIRAN. S1 thesis, Institut Teknologi Sains Bandung.

Mujadid, Fahmi Imam (2019) EVALUASI KAJIAN INVESTASI PADA LAPANGAN “X”. S1 thesis, Institut Teknologi Sains Bandung.

Mulya, Sugiharta (2021) EVALUASI KEEKONOMIAN PADA RENCANA KERJA SAMA ANTARA PT. CAKRA SEBAGAI MITRA DENGAN PT. PUTRA PSC DALAM PROGRAM PENGEMBANGAN LAPANGAN MINYAK X (STUDI KASUS). S1 thesis, Institut Teknologi Sains Bandung.

Mushandy, Nanda Adhitya (2019) DESAIN PENYEMENAN SUMUR INJEKSI CO2 SUMUR Y LAPANGAN X. S1 thesis, Institut Teknologi Sains Bandung.

Napitupulu, Mountest Qiu (2019) ANALISA PRESSURE BUILD UP TEST DENGAN MENGGUNAKAN METODE HORNER UNTUK PENENTUAN KERUSAKAN FORMASI PADA SUMUR TBN-XX. S1 thesis, Institut Teknologi Sains Bandung.

Nasrullah, Mohamad Wildan (2021) ANALISA KUALITAS DAN KARAKTERISTIK BATUGAMPING SEBAGAI BAHAN BAKU SEMEN PORTLAND PT INDOCEMENT TUNGGAL PRAKARSA TBK CITEUREUP – BOGOR. S1 thesis, Institut Teknologi Sains Bandung.

Natalia, Christin (2019) STUDI SENSITIVITAS KEDALAMAN KATUP INJEKSI GAS LIFT UNTUK MENINGKATKAN PEROLEHAN SUMUR X. S1 thesis, Institut Teknologi Sains Bandung.

Ningsih, Yuni Kurnia (2019) ANALISA CRUDE OIL DAN PENGARUH INJEKSI SOLVENT TERHADAP LAJU PRODUKSI PADA SUMUR NCT-127 LAPANGAN DREAM. S1 thesis, Institut Teknologi Sains Bandung.

Nugraha, Ganjar (2022) EVALUASI CASING DESIGN MENGGUNAKAN METODA MAXIMUM LOAD PADA SUMUR X LAPANGAN Y. S1 thesis, Institut Teknologi Sains Bandung.

Nugraha, Mochamad Aditya Citra (2022) PERANCANGAN ULANG DESAIN ARTICISIAL LIFT ELECTRICAL SUBMERSIBLE PUMP UNTUK MENINGKATKAN PRODUKSI PADA SUM UR “X” LAPANGAN” Y”. S1 thesis, Institut Teknologi Sains Bandung.

Nugraha, Septian Tri (2018) OPTIMASI PRODUKSI SUMUR GAS LIFT A-86 LAPANGAN ALPHA. S1 thesis, Institut Teknologi Sains Bandung.

Nugroho, Windu Ari (2018) DESAIN LUMPUR PEMBORAN MENGGUNAKAN PEMBERAT BARIT DAN KALSIUM KARBONAT DENGAN NILAI SPECIFIC GRAVITY YANG SAMA. S1 thesis, Institut Teknologi Sains Bandung.

Nur, Tajudin (2021) ANALISA FRACTIONAL FLOW & CO LOG UNTUK EVALUASI PERUBAHAN SATURASI SETELAH PRODUKSI PADA SUMUR S-16. S1 thesis, Institut Teknologi Sains Bandung.

Nurrahim, Hendy Zulfian (2020) KAJIAN KEEKONOMIAN DAN RISIKO TERHADAP PERUBAHAN PSC COST RECOVERY MENJADI PSC GROSS SPLIT UNTUK LAPANGAN X. S1 thesis, Institut Teknologi Sains Bandung.

Nurseha, Maysithah Zahrani (2022) PERBANDIANGAN HASIL ANALISA DESAIN CONTINUOUS GAS LIFT SECARA MANUAL DAN SOFTWARE WELLFLO PT PERTAMINA EP ASSET 3 FIELD JATIBARANG. S1 thesis, Institut Teknologi Sains Bandung.

Nursyamsi, Dede (2021) ANALISIS PRESSURE TRANSIENT PADA PERIODE DRAWDOWN DAN BUILD UP DI SUMUR X LAPANGAN Y. S1 thesis, Institut Teknologi Sains Bandung.

Nyama, Orume Cilvie (2019) PENGGUNAAN ADVANCED WIRELINE LOG UNTUK ANALISA DATA LOG KONVENSIONAL. S1 thesis, Institut Teknologi Sains Bandung.

Paharri, Bobby Nurman (2018) OPTIMASI POMPA SUCKER ROD PADA SUMUR O LAPANGAN T BERDASARKAN PENURUNAN EFISIENSI VOLUMETRIK POMPA. S1 thesis, Institut Teknologi Sains Bandung.

Palabiran, Merandy (2018) PERSAMAAN ARCHIE UNTUK PENENTUAN WATER SATURATION PADA KASUS LOW-RESISTIVITY SANDSTONE. S1 thesis, Institut Teknologi Sains Bandung.

Pembang, Wismoyo Arismunandar (2019) PERANCANGAN MATRIX ACIDIZING UNTUK MENINGKATKAN LAJU PRODUKSI PADA FORMASI SANDSTONE LAPANGAN SR SUMUR WAP. S1 thesis, Institut Teknologi Sains Bandung.

Pemulo, Altando Yusup (2023) STUDI PERBANDINGAN METODE RESERVOIR ROCK TYPING – APLIKASI DATA CORE. S1 thesis, Institut Teknologi Sains Bandung.

Perdana, M. Rullyansyah Adityo (2019) DESAIN KOMPLESI SUMUR GAS ASAM (SOUR GAS) DI LAPANGAN XYZ, JAWA TENGAH. S1 thesis, Institut Teknologi Sains Bandung.

Permana, Indra Yuda (2018) EVALUASI DAN RE-OPTIMASI SUCKER ROD PUMP PADA SUMUR K -17 LAPANGAN YP BERDASARKAN EFISIENSI. S1 thesis, Institut Teknologi Sains Bandung.

Prabowo, Emeralda Monica Tondo (2021) PENENTUAN CASING DESIGN DENGAN METODA MAXIMUM LOAD PADA SUMUR “X”. S1 thesis, Institut Teknologi Sains Bandung.

Prakoso, Bagas (2019) ANALISIS KEEKONOMIAN LAPANGAN AQA PADA MULTILAYER BERDASARKAN PEMILIHAN SKENARIO METODE KOMPLESI. S1 thesis, Institut Teknologi Sains Bandung.

Pratama, Pandu Cahya (2021) EVALUASI DAN RE-OPTIMASI SUCKER ROD PUMP PADA SUMUR X LAPANGAN Y BERDASARKAN EFISIENSI VOLUMETRIK POMPA. S1 thesis, Institut Teknologi Sains Bandung.

Pratama, Yoga Buana (2018) KAJIAN KEEKONOMIAN PENGEMBANGAN LAPANGAN-LAPANGAN MIGAS DI WILAYAH Y. S1 thesis, Institut Teknologi Sains Bandung.

Prathama, Hendra (2020) PERBANDINGAN RANCANGAN ESP MENGGUNAKAN POMPA REDA DAN EJP UNTUK MEMAKSIMALKAN EFISIENSI PRODUKSI SUMUR MINYAK “TM 15”. S1 thesis, Institut Teknologi Sains Bandung.

Prawira, Firdi Madya (2021) DESAIN SEPARATOR HORIZONTAL TIGA FASA STUDI KASUS LAPANGAN X. S1 thesis, Institut Teknologi Sains Bandung.

Prayoga, Illavy A (2019) HASIL EVALUASI DAN RE-OPTIMASI SUCKER ROD PUMP BERDASARKAN PENURUNAN EFISIENSI VOLUMETRIK POMPA PADA SUMUR R LAPANGAN I. S1 thesis, Institut Teknologi Sains Bandung.

Purnama, Gandewa Gayuh (2017) EVALUASI KEEKONOMIAN WILAYAH KERJA MIGAS KONVENSIONAL IBU MENGGUNAKAN MODEL KONTRAK BAGI HASIL PRODUCTION SHARING CONTRACT (PSC) DAN GROSS SPLIT. S1 thesis, Institut Teknologi Sains Bandung.

Purnomo, Aji (2018) ANALISIS PRODUKTIVITAS SUMUR X LAPANGAN Y DENGAN METODE ACID FRACTURING. S1 thesis, Institut Teknologi Sains Bandung.

Putra, Daniel Kevin Kurnia (2017) MODEL USULAN KERJASAMA DALAM PENGELOLAAN WILAYAH KERJA MIGAS X MENGGUNAKAN MODEL KONTRAK BAGI HASIL PRODUCTION SHARING CONTRACT (PSC). S1 thesis, Institut Teknologi Sains Bandung.

Putra, Putu Dede Udayana Laksmana (2018) ANALISIS PRODUKTIVITAS THRU-TUBING SANDSCREEN PADA SUMUR O, LAPANGAN D. S1 thesis, Institut Teknologi Sains Bandung.

Rafiansyah, Fakhri (2019) PEMILIHAN SKENARIO PRODUKSI PADA ZONA MULTILAYER SUMUR DRY GAS KBG-1. S1 thesis, Institut Teknologi Sains Bandung.

Rahayu, Muhamad Yudistira (2019) STUDI PERBANDINGAN SEBARAN PERMEABILITAS BERDASARKAN DUA METODE ROCK TYPING PADA SINGLE WELL MODEL. S1 thesis, Institut Teknologi Sains Bandung.

Ramada, Andro (2019) STUDI OPTIMASI PERBANDINGAN METODE ARTIFICIAL LIFT DENGAN MENGGUNAKAN GAS LIFT VALVE DAN GAS LIFT MACARONI PADA SUMUR H35-SS. S1 thesis, Institut Teknologi Sains Bandung.

Ramadhan, Diego (2018) ANALISIS PERFORMA STIMULASI ACIDIZING JOB PADA SUMUR DRC-053 , JAWA-BARAT. S1 thesis, Institut Teknologi Sains Bandung.

Ramadhan, Gigih Ilham (2019) PERENCANAAN GAS LIFT DAN PREDIKSI KINERJA SUMUR S-29. S1 thesis, Institut Teknologi Sains Bandung.

Ratnasari, Dewi (2019) DESAIN ULANG ELECTRIC SUBMERSIBLE PUMP (ESP) PADA SUMUR “X”. S1 thesis, Institut Teknologi Sains Bandung.

Regiansyah, Regi (2018) KAJIAN KEEKONOMIAN PENGEMBANGAN LAPANGAN X BERDASARKAN PREDIKSI HARGA MINYAK. S1 thesis, Institut Teknologi Sains Bandung.

Revydo, Chevron (2023) OPTIMASI PERENCANAAN DAN EKSEKUSI CEMENTING JOB PADA WELL MAMA. S1 thesis, Institut Teknologi Sains Bandung.

Rifaldy, Vido (2019) ANALISA KESTABILAN LUBANG SUMUR SECARA GEOMEKANIK PADA SUMUR X LAPANGAN Y. S1 thesis, Institut Teknologi Sains Bandung.

Rinaldy, Reza Saputra (2020) EVALUASI HASIL MATRIX ACIDIZING TERHADAP PRODUKTIVITAS SUMUR A PADA LAPANGAN F. S1 thesis, Institut Teknologi Sains Bandung.

Rivaldi, Alvi (2023) EVALUASI KEEKONOMIAN PADA LAPANGAN Y MENGGUNAKAN MODEL KONTRAK PRODUCTION SHARING CONTRACT COST RECOVERY (PSC CR) DAN PRODUCTION SHARING CONTRACT GROSS SPLIT (PSC GS). S1 thesis, Institut Teknologi Sains Bandung.

Rofi, Muhammad Nur (2019) HUBUNGAN POROSITAS TERHADAP RW APPARENT PADA LOW RESISTIVITY RESERVOIR. S1 thesis, Institut Teknologi Sains Bandung.

Rohman, Abdul (2022) ANALISIS ZONA POTENSIAL HIDROKARBON DARI DATA RESERVOIR SATURATION TOOL (RST) LOG DAN WIRELINE LOG PADA FORMASI X DI LAPANGAN Y. S1 thesis, Institut Teknologi Sains Bandung.

Rohmawati, Lisna (2017) OPTIMASI LAJU PRODUKSI ELECTRIC SUBMERSIBLE PUMP PADA SUMUR X LAPANGAN Y. S1 thesis, Institut Teknologi Sains Bandung.

Romadhona, Eka Sudaryadi (2019) EVALUASI DESAIN KOMPLESI SUMUR GAS INJEKSI SUMUR X-4. S1 thesis, Institut Teknologi Sains Bandung.

Rusyidi, Beelly Sony (2019) PERANCANGAN ELECTRICAL SUBMERSIBLE PUMP PADA SUMUR HIGH POUR POINT OIL BSR-1. S1 thesis, Institut Teknologi Sains Bandung.

Sagala, Fredrik Bonajati Win Harto (2017) EVALUASI DAN PERENCANAAN TREATMENT MATRIX ACIDIZING DALAM PENINGKATAN LAJU PRODUKSI PADA SUMUR X LAPANGAN S. S1 thesis, Institut Teknologi Sains Bandung.

Salam, Salh Andika (2019) PERANCANGAN PROSES ACIDIZING DENGAN METODE MATRIX ACIDIZING DI SUMUR X PADA LAPANGAN Y. S1 thesis, Institut Teknologi Sains Bandung.

Santiriolin, Jita (2022) EVALUASI UP SIZE ATAU DOWN SIZE POMPA ESP TERPASANG UNTUK OPTIMASI PRODUKSI DI SUMUR “SAN DAN LIN ” STRUKTUR “X DAN Y” FIELD “GL26”. S1 thesis, Institut Teknologi Sains Bandung.

Sanubari, Anak Agung Bagus Prihardian (2018) PENGUKURAN LIQUID LEVEL DENGAN SONOLOG TEST DAN EFEKNYA TERHADAP PERHITUNGAN CADANGAN SISA DI PERTAMINA HULU ENERGI NSB NSO. S1 thesis, Institut Teknologi Sains Bandung.

Sari, Yeti Permata Sari (2019) STUDI SIMULASI INJEKSI GAS HIDROKARBON TIDAK TERLARUT UNTUK MENINGKATKAN PEROLEHAN MINYAK PADA RESERVOIR A. S1 thesis, Institut Teknologi Sains Bandung.

Sasmita, Tio Rizky Arga (2018) SELEKSI DAN PERINGKATAN FAKTOR YANG MEMPENGARUHI ROP, PADA OPERASI PEMBORAN BERARAH SUMUR EKSPLORASI MENGGUNAKAN METODE ANN. S1 thesis, Institut Teknologi Sains Bandung.

Sayendra, Fadhel Hizbullah (2023) ANALISA DAN OPTIMASI PERENCANAAN PENGEBORAN BERARAH PADA SUMUR RE-ENTRY MENGGUNAKAN HWU-600K: STUDI KASUS SUMUR X-12 LAPANGAN UP PT SAKA ENERGI INDONESIA. S1 thesis, Institut Teknologi Sains Bandung.

Septiawan, Dino (2019) ANALISA SENSITIVITAS METODE EOR INJEKSI KIMIA TERHADAP FAKTOR PEROLEHAN MINYAK PADA RESERVOIR HETEROGEN DENGAN POLA INJEKSI 5 TITIK DAN HUBUNGANNYA DENGAN DECLINE RATE BEHAVIOR. S1 thesis, Institut Teknologi Sains Bandung.

Setiawan, Irfenda (2019) EVALUASI KEEKONOMIAN WILAYAH KERJA MIGAS “SETIARA” PASCA BERAKHIRNYA KONTRAK DENGAN PEMERINTAH. S1 thesis, Institut Teknologi Sains Bandung.

Shadrina, Nurus (2019) EVALUASI HASIL MINI ACID FRACTURING TERHADAP PRODUKTIVITAS SUMUR X LAPANGAN Y. S1 thesis, Institut Teknologi Sains Bandung.

Silitonga, Samuel Halomoan (2019) ANALISA DESAIN KOMPLESI LAUT DALAM SUMUR X-7 LAPANGAN Y, KALIMANTAN TIMUR. S1 thesis, Institut Teknologi Sains Bandung.

Sobari, Robbi (2019) EVALUASI KEBERHASILAN STIMULASI SUMUR DENGAN METODE MATRIX ACIDIZING PADA SUMUR X LAPANGAN Y UNTUK MENINGKATKAN LAJU PRODUKSI. S1 thesis, Institut Teknologi Sains Bandung.

Suciyati, Amelia (2019) EVALUASI DAN PERANCANGAN SUCKER ROD PUMP SUMUR-A DENGAN ANALISA DATA DYNAGRAPH DAN VALVE TEST DI LAPANGAN-Y. S1 thesis, Institut Teknologi Sains Bandung.

Sumaatmadja, Sasyi Niskala (2019) PENENTUAN CASING SETTING DEPTH DAN EVALUASI CASING DESIGN PADA SUMUR XY LAPANGAN PETROLEA. S1 thesis, Institut Teknologi Sains Bandung.

Sumardi, Harry Ramadhan (2018) STUDI PARAMETRIK PADA PRODUKSI GAS METANA BATUBARA DENGAN MEMPERTIMBANGKAN EFEK INTERFERENSI ANTAR SUMUR. S1 thesis, Institut Teknologi Sains Bandung.

Supianudin, Supianudin (2018) STRATEGI PERUBAHAN PATTERN WATERFLOODING UNTUK MENINGKATKAN RECOVERY FACTOR. S1 thesis, Institut Teknologi Sains Bandung.

Supriadi, Didi (2019) EVALUASI DAN OPTIMASI PRODUKSI DENGAN MEMPERTIMBANGKAN EFISIENSI ELECTRICAL SUBMERSIBLE PUMP DI SUMUR A. S1 thesis, Institut Teknologi Sains Bandung.

Syah, Andrie Agakhan (2019) EVALUASI KEEKONOMIAN RENCANA PENGEMBANGAN LAPANGAN GAS X BERDASARKAN KESEPAKATAN HARGA GAS ANTARA PRODUSEN DAN PEMBELI GAS. S1 thesis, Institut Teknologi Sains Bandung.

Tambunan, Kevin Reynald Parmonangan (2015) SIMULASI PERAMALAN PRODUKSI SUMUR X. S1 thesis, Institut Teknologi Sains Bandung.

Taufiqurrahman, Muhammad (2017) PERENCANAAN PEMBORAN BERARAH PADA SUMUR X LAPANGAN Y : DESAIN TRAJEKTORI MENGGUNAKAN METODA MINIMUM OF CURVATURE DAN DESAIN BOTTOM HOLE ASSEMBLY (BHA). S1 thesis, Institut Teknologi Sains Bandung.

Uqbah, Muhammad Farid (2019) PERANCANGAN SEMEN PEMBORAN MENGGUNAKAN SQUEZEE CEMENTING PADA SUMUR X LAPANGAN Y. S1 thesis, Institut Teknologi Sains Bandung.

Utomo, Adhimas Satrio (2019) PERANCANGAN PROSES ACIDIZING PADA BATUAN KARBONAT DENGAN METODE MATRIX ACIDIZING DI SUMUR X. S1 thesis, Institut Teknologi Sains Bandung.

Utomo, Andoro Hendi (2018) PERENCANAAN SUSPENSI SUMUR DENGAN MENGGUNAKAN POLYMER PLUG. S1 thesis, Institut Teknologi Sains Bandung.

Warfandu, Anisa Nurul Maulia (2023) EVALUASI DAN REDESIGN ELECTRIC SUBMERSIBLE PUMP UNTUK REAKTIVASI SUMUR YANG MENGALAMI PROBLEM FISH PADA LAPANGAN MIGAS. S1 thesis, Institut Teknologi Sains Bandung.

Weldi, Rio (2023) PENGARUH RAPAT ARUS DAN KONSENTRASI ION NIKEL TERHADAP KEKASARAN PERMUKAAN FOIL NIKEL DENGAN METODE ELEKTROLISIS. S1 thesis, Institut Teknologi Sains Bandung.

Wibowo, Andika Triseptyan (2018) DESAIN CASING SUMUR PADA PENGEMBANGAN LAPANGAN X. S1 thesis, Institut Teknologi Sains Bandung.

Wibowo, Tri (2023) EVALUASI CASING DESIGN SUMUR PEMBORAN DENGAN METODE MAXIMUM LOAD PADA SUMUR X DI LAPANGAN Y. S1 thesis, Institut Teknologi Sains Bandung.

Wicaksana, Arya (2018) PERENCANAAN DESAIN GAS LIFT SUMUR A-01 (EKSPLORASI) LAPANGAN Y. S1 thesis, Institut Teknologi Sains Bandung.

Wiguna, Renaldi (2022) EVALUASI CASING DESIGN PADA SUMUR X LAPANGAN Y. S1 thesis, Institut Teknologi Sains Bandung.

Wijaya, Davin (2015) PERBANDINGAN KENAIKAN PRODUKSI DENGAN METODE NATURAL FLOW, INJEKSI AIR, DAN INJEKSI SURFAKTAN MENGGUNAKAN POLA 5-SPOT. S1 thesis, Institut Teknologi Sains Bandung.

Wijaya, Gilang Ardi (2018) EVALUASI KEEKONOMIAN PADA POFD LAPANGAN X DI AREA SUMATERA SELATAN MENGGUNAKAN MODEL KONTRAK KSO. S1 thesis, Institut Teknologi Sains Bandung.

Youriandila, Alvi (2019) APLIKASI METODE ROCK TYPING PGS MENGGUNAKAN DATA LOG DUA SUMUR UNTUK PEMODELAN RESERVOIR. S1 thesis, Institut Teknologi Sains Bandung.

Yulianti, Hanifah (2022) ANALISA PENENTUAN CASING SETTING DEPTH MENGGUNAKAN METODE BOTTOM UP DENGAN MEMPERHATIKAN FAKTOR DRILLING HAZARD DAN PENENTUAN KICK TOLERANCE PADA SUMUR “HY-10”. S1 thesis, Institut Teknologi Sains Bandung.

Yustiar, Adi (2019) EVALUASI DESAIN SURFACE CASING DAN INTERMEDIATE CASING PADA SUMUR X. S1 thesis, Institut Teknologi Sains Bandung.

Zahra, Tsamarah Alya (2019) EVALUASI PARAMETER KEBERHASILAN SCALE INHIBITOR SQUEEZING UNTUK MENINGKATKAN LAJU PRODUKSI PADA SUMUR “U” LAPANGAN “LALA”. S1 thesis, Institut Teknologi Sains Bandung.

Zhafran, Dary Ahmad (2019) PERENCANAAN GAS LIFT SECARA MANUAL SUMUR D-10 DENGAN SENSITIVITAS JUMLAH GAS INJEKSI DAN TEKANAN INJEKSI. S1 thesis, Institut Teknologi Sains Bandung.

Zulfa, Husna (2018) MIGRASI WELL INTEGRITY MANAGEMENT SYSTEM DARI API RP 90-2 KE ISO 16530 PART-1. S1 thesis, Institut Teknologi Sains Bandung.

Zulkipli, Imam (2018) PREDIKSI PERMEABILITAS MENGGUNAKAN RESPON LOG NMR DAN LOG KONVENSIONAL PADA SUMUR XX-01 DI LAPANGAN X. S1 thesis, Institut Teknologi Sains Bandung.

This list was generated on Tue Oct 8 00:55:19 2024 UTC.