Ayuning, Niken Tri (2018) ANALISIS BEBAN RUNTUH SEBAGAI ACUAN KEBUTUHAN PENYANGGA DI TAMBANG BAWAH TANAH GUDANG HANDAK UBPE PONGKOR PT ANEKA TAMBANG (PERSERO) TBK. S1 thesis, Institut Teknologi Sains Bandung.
TA_Niken Tri Ayuning_122.13.014_Cover.pdf
Download (435kB)
TA_Niken Tri Ayuning_122.13.014_BAB 1.pdf
Download (313kB)
TA_Niken Tri Ayuning_122.13.014_Bibliography.pdf
Download (290kB)
Abstract
Unit Bisnis Pertambangan Emas (UBPE) PT Aneka Tambang (Persero) Tbk. adalah salah satu perusahaan tambang bawah tanah milik negara dengan metode penambangan cut and fill. Permasalahan berkaitan dengan karakteristik batuan menjadi masalah utama pada metode penambangan ini. Sehingga diperlukan suatu jaminan bahwa lubang bawah tanah yang dibuat tetap dalam keadaan stabil. Untuk mengatasi ketidakstabilan lubang bukaan di area penambangan Gudang Handak, maka diperlukan sistem penyanggaan. Agar dapat memberikan rekomendasi penyanggaan yang tepat, terlebih dahulu dilakukan analisis terhadap beban runtuh yang akan disangga. Kemudian dibuat suatu acuan penyanggaan untuk area penambangan Gudang Handak yang diharapkan dapat menghasilkan penyanggaan yang optimum ditinjau dari aspek geoteknik. Penelitian dilakukan di dua lokasi stope produksi dan satu akses development yang masih aktif ditambang. Penelitian ini bertujuan untuk memberikan rekomendasi penyangga sesuai dengan potensi beban runtuh di atap lubang bukaan, baik untuk runtuhan baji maupun runtuhan massa batuan. Runtuhan baji dianalisis dengan bantuan perangkat lunak Unwedge 3.0. Runtuhan massa batuan dianalisis dengan klasifikasi RMR, Q-System dan perangkat lunak Examine 2D. Hasil beban runtuh dengan analisis runtuhan baji yang mungkin terjadi sebesar 39,03 ton sampai 117,29 ton, sedangkan beban runtuh massa batuan yang mungkin terjadi berdasarkan metode empiris sebesar 20,61 ton sampai 27,78 ton dan berdasarkan metode numerik sebesar 5,39 ton sampai 13,43 ton. Rekomendasi penyangga berdasarkan hasil analisis runtuhan baji yaitu Mechanical Anchored Friction 1,7 m dengan spasi 1m x 1m. Rekomendasi penyanggaan berdasarkan hasil analisis runtuhan massa batuan yaitu Friction Bolt 1,4 m dengan spasi 1,8mx1,8m sampai dengan Friction Bolt panjang 1,4 m dengan spasi 1,3mx1,3m menggunakan penyangga tambahan berupa H-Beam (1 set).rnrnPongkor Gold Mine, PT Aneka Tambang (Persero) Tbk. is a one of the state- owned mining company which use cut and fill underground mining method. Problems related to the charateristics of the rocks become a major problem in this mining method. So it needs a guarantee that the underground hole made remains stable. To overcome the instability of openings in the mining area of Gudang Handak, a supporting system is required. In order to provide the right supporting recommendation, first an analysis of the weight failure will be supported. A supporting reference for Gudang Handak mining area is expected to produce optimum supproting in terms of geotechical aspects. The research was conducted in two production stope locations and one access development that is still actively mined. The research is aimed to provide support recommendations that are appropriate for the weight of failure in the stope back, for both wedge and rock mass failures. Wedge failure analysis was carrier out using Unwedge 3.0 software. Rock mass failure analysis utilised RMR, Q Classification System and Examine 2D software. The result of weight failure from wedge failure analysis that might happen is ranged between 39,03 ton until 117,29 ton, while weight of rock mass failure that might happen based on empirical method is ranged 20,61 ton until 27,78 ton and based on numerical methode is ranged between 5,39 ton until 13,43 ton. Support recommendation based on the result of wedge failure analysis is mechanically anchore friction bolt (bolt length 2,4 m; bolt spacing 1mx1m until 1,1mx1,1m). Support recommendation based on the result of rock mass failure analysis is friction bolt (bolt length 1,4; bolt spacing 1,8mx1,8m until 1,3mx1,3m) and using an extra supported of H-Beam (1 set).
Item Type: | Thesis (S1) |
---|---|
Contributors: | Contribution Contributors/Pembimbing NIDN Thesis advisor Syafrizal, Syafrizal NIDN Thesis advisor Arbiansyah, M. NIDN |
Subjects: | T Technology > TN Mining engineering. Metallurgy |
Divisions: | Fakultas Teknik dan Desain > Teknik Pertambangan |
Depositing User: | Perpustakaan ITSB |
Date Deposited: | 28 Jul 2024 03:29 |
Last Modified: | 28 Jul 2024 03:29 |
URI: | https://repository.itsb.ac.id/id/eprint/803 |