Items where Division is "Teknik Perminyakan" and Year is 2023
Azzahra, Fatimah (2023) PERENCANAAN SQUEEZE CEMENTING PADA SUMUR AZR-26 LAPISAN TAF-3.1. S1 thesis, Institut Teknologi Sains Bandung.
Darajat, Aditya Raffi'ud (2023) EVALUASI TECHNICAL RESERVE PADA LAPANGAN ARD BERDASARKAN KARAKTERISTIK PERFORMA PRODUKSI. S1 thesis, Institut Teknologi Sains Bandung.
Dwisuryo, Guno Aji (2023) EVALUASI KEEKONOMIAN MODEL KONTRAK PRODUCTIOIN SHARING CONTRACT COST RECOVERY DAN GROSS SPLIT PADA LAPANGAN X. S1 thesis, Institut Teknologi Sains Bandung.
Elawati, Elawati (2023) ANALISA DESAIN KOMPLESI LAUT DALAM PADA SUMUR “X” LAPANGAN “EL” KALIMANTAN TIMUR. S1 thesis, Institut Teknologi Sains Bandung.
Fadillah, Reza (2023) ANALISA PERBANDINGAN SHEAR STRESS RHEOLOGY LUMPUR PEMBORAN MENGGUNAKAN APLIKASI PADA SECTION ASELOLE LAPANGAN JOSS. S1 thesis, Institut Teknologi Sains Bandung.
Kusuma, Mochamad Veryel Okta (2023) PERENCANAAN DESAIN LUMPUR KCl POLYMER PHPA DAN HIDROLIKA PEMBORAN SUMUR X LAPANGAN Y PT. SUMBER DATA PERSADA. S1 thesis, Institut Teknologi Sains Bandung.
Mahesa, M Ibras (2023) ANALISIS PERBANDINGAN SURVEY CALCULATION METHODS PADA LINTASAN PEMBORAN BERARAH SUMUR Y LAPANGAN EZ-17. S1 thesis, Institut Teknologi Sains Bandung.
Mandiri, Pandyo Cika Putra (2023) EVALUASI CASING DESIGN DENGAN METODE MAXIMUM LOAD PADA SUMUR “PCPM-29“ LAPANGAN “PM“. S1 thesis, Institut Teknologi Sains Bandung.
Pemulo, Altando Yusup (2023) STUDI PERBANDINGAN METODE RESERVOIR ROCK TYPING – APLIKASI DATA CORE. S1 thesis, Institut Teknologi Sains Bandung.
Putri, Aprilia Rizki Komara (2023) EVALUASI DAN OPTIMASI ELECTRICAL SUBMERSIBLE PUMP DENGAN UJI SENSITIVITAS DARI OPERATING FREQUENCY DAN JUMLAH STAGES UNTUK MENINGKATKAN LAJU PRODUKSI PADA SUMUR AK P-10. S1 thesis, Institut Teknologi Sains Bandung.
Rafli, Muhammad (2023) OPTIMASI PARAMETER PEMBORAN MENGGUNAKAN METODE BOURGOYNE DAN YOUNG UNTUK MENINGKATKAN LAJU PEMBORAN PADA SUMUR RAF-1 DI LAPANGAN Y. S1 thesis, Institut Teknologi Sains Bandung.
Ramadhan, Okhy (2023) EVALUASI ELECTRIC SUBMERSIBLE PUMP DENGAN PENENTUAN UPSIZING ATAU DOWNSIZING PADA WELL OR-1, OR-2, OR-3, OR-4, OR-5, OR-6 FIELD “RAMA”. S1 thesis, Institut Teknologi Sains Bandung.
Revydo, Chevron (2023) OPTIMASI PERENCANAAN DAN EKSEKUSI CEMENTING JOB PADA WELL MAMA. S1 thesis, Institut Teknologi Sains Bandung.
Rivaldi, Alvi (2023) EVALUASI KEEKONOMIAN PADA LAPANGAN Y MENGGUNAKAN MODEL KONTRAK PRODUCTION SHARING CONTRACT COST RECOVERY (PSC CR) DAN PRODUCTION SHARING CONTRACT GROSS SPLIT (PSC GS). S1 thesis, Institut Teknologi Sains Bandung.
Roniansyah, Dimas (2023) PENILAIAN KOMERSIAL PADA LAPANGAN DR-11 MENGGUNAKAN MODEL KONTRAK PRODUCTION SHARING CONTRACT COST RECOVERY (PSC-CR) DAN PRODUCTION SHARING CONTRACT GROSS SPLIT (PSC-GS). S1 thesis, Institut Teknologi Sains Bandung.
Sayendra, Fadhel Hizbullah (2023) ANALISA DAN OPTIMASI PERENCANAAN PENGEBORAN BERARAH PADA SUMUR RE-ENTRY MENGGUNAKAN HWU-600K: STUDI KASUS SUMUR X-12 LAPANGAN UP PT SAKA ENERGI INDONESIA. S1 thesis, Institut Teknologi Sains Bandung.
Sesa, Grace Sonya Rosalie (2023) OPTIMASI PRODUKSI MENGGUNAKAN METODE PARTIAL RECYCLE LINE UNTUK MENGURANGI PENGGUNAAN VARIABLE SPEED DRIVE (VSD) DAN REDESAIN ELECTRIC SUBMERSIBLE PUMP (ESP) DI SUMUR GSR-11 LAPANGAN Y. S1 thesis, Institut Teknologi Sains Bandung.
Stivano, Michael Gilberth (2023) EVALUASI DAN OPTIMASI ELECTRIC SUBMERSIBLE PUMP PADA SUMUR X LAPANGAN JATIBARANG. S1 thesis, Institut Teknologi Sains Bandung.
Warfandu, Anisa Nurul Maulia (2023) EVALUASI DAN REDESIGN ELECTRIC SUBMERSIBLE PUMP UNTUK REAKTIVASI SUMUR YANG MENGALAMI PROBLEM FISH PADA LAPANGAN MIGAS. S1 thesis, Institut Teknologi Sains Bandung.
Wibowo, Tri (2023) EVALUASI CASING DESIGN SUMUR PEMBORAN DENGAN METODE MAXIMUM LOAD PADA SUMUR X DI LAPANGAN Y. S1 thesis, Institut Teknologi Sains Bandung.
Wijaya, Riki Oktapriandi (2023) ANALISIS KEEKONOMIAN DAN PERBANDINGAN MODEL KONTRAK PRODUCTION SHARING CONTRACT COST RECOVERY DAN PRODUCTION SHARING CONTRACT GROSS SPLIT PADA LAPANGAN JAYY. S1 thesis, Institut Teknologi Sains Bandung.