Items where Division is "Teknik Perminyakan" and Year is 2017

Group by: Creators/Penulis | Item Type | No Grouping
Jump to: A | H | P | R | S | T
Number of items: 8.

A

Abdillah, Rifqi (2017) EVALUASI DESAIN PRODUCTION CASING 13-3/8” PADA SUMUR EKSPLORASI LAUT DALAM LAPANGAN XX. S1 thesis, Institut Teknologi Sains Bandung.

Afrisca, Cindy Clara (2017) EVALUASI RIGLESS WELL ABANDONMENT PADA LAPANGAN Y. S1 thesis, Institut Teknologi Sains Bandung.

H

Hardiansyah, Hardiansyah (2017) OPTIMASI DESAIN PEREKAHAN HIDRAULIK DENGAN MODEL GEOMEKANIK. S1 thesis, Institut Teknologi Sains Bandung.

P

Purnama, Gandewa Gayuh (2017) EVALUASI KEEKONOMIAN WILAYAH KERJA MIGAS KONVENSIONAL IBU MENGGUNAKAN MODEL KONTRAK BAGI HASIL PRODUCTION SHARING CONTRACT (PSC) DAN GROSS SPLIT. S1 thesis, Institut Teknologi Sains Bandung.

Putra, Daniel Kevin Kurnia (2017) MODEL USULAN KERJASAMA DALAM PENGELOLAAN WILAYAH KERJA MIGAS X MENGGUNAKAN MODEL KONTRAK BAGI HASIL PRODUCTION SHARING CONTRACT (PSC). S1 thesis, Institut Teknologi Sains Bandung.

R

Rohmawati, Lisna (2017) OPTIMASI LAJU PRODUKSI ELECTRIC SUBMERSIBLE PUMP PADA SUMUR X LAPANGAN Y. S1 thesis, Institut Teknologi Sains Bandung.

S

Sagala, Fredrik Bonajati Win Harto (2017) EVALUASI DAN PERENCANAAN TREATMENT MATRIX ACIDIZING DALAM PENINGKATAN LAJU PRODUKSI PADA SUMUR X LAPANGAN S. S1 thesis, Institut Teknologi Sains Bandung.

T

Taufiqurrahman, Muhammad (2017) PERENCANAAN PEMBORAN BERARAH PADA SUMUR X LAPANGAN Y : DESAIN TRAJEKTORI MENGGUNAKAN METODA MINIMUM OF CURVATURE DAN DESAIN BOTTOM HOLE ASSEMBLY (BHA). S1 thesis, Institut Teknologi Sains Bandung.

This list was generated on Thu Sep 19 08:01:25 2024 UTC.